top of page

STEEL CREW

Part of Shameless' portfolio is our team of experienced scaffolders and steelhands, who make up our steel crew. Our scaffolders specialize in the assembly, disassembly, and work with steel structures at height. The construction process is carried out with the utmost precision and a strong emphasis on safety. Our steelhands are the right hand of the scaffolders in building scaffolding structures during events. As the ground crew, their task is to handle heavy steel components during the assembly and disassembly of grandstands and music stages. Working with our steel crew requires knowledge of materials and a meticulous approach to ensure that each construction meets strict safety standards. The steel crew is equipped with all necessary PPE to meet health and safety regulations – helmets, boots, gloves, reflective gear, and equipment for working at heights. Our advantage is the connection between the steel crew and other components of the build, especially with forklift drivers, crane operators, and the technicians on the project. This collaboration ensures effective and timely execution. Contact us and see for yourself why our steel crew is among the best in the Czech Republic and neighbouring countries.

EXPERTS IN SCAFFOLDING WORK

REGULAR TRAINING

 SAFETY IS A PRIORITY

services

steelhands

STEELHANDS

Scaffolders

SCAFFOLDERS

steel crew

training and certifications

Our steel crew undergoes regular internal and external training to meet the highest safety standards and industry requirements. We hold IRATA certification, which guarantees professionalism and safety when working at heights. 

team

Roman Arendas

Erik Pedre

 Steel crew

 "As a member of the steel crew at Shameless, I work closely with other teams, which makes this job very diverse and no two tasks are the same. As a scaffolder, I get to work behind the scenes at major concerts and peek behind the curtain, which is something I really enjoy."

shameless

Roman Arendáš

Scaffolder

 "Working as a scaffolder at Shameless taught me that every detail in the assembly of steel structures is crucial. Thanks to regular training and technical briefings, I’m confident that our installations meet the highest safety standards."

Shameless

ROCK FOR PEOPLE

2021-2025

 Since 2021, we have been responsible for the construction of both main stages at the largest rock festival in the Czech Republic. Our steel crew works every year with Megaforce to build one of the largest festival roofs in Europe (Fat Lady), with a width of 47 meters and a height of 21 meters. In 2024, in collaboration with T Servis, we took on the full preparation and construction of the second festival stage (T STAGE TESS) for the first time. Both stages together have a load capacity of 145 tons.

references

T STAGE TESS

2024

 In May ‘24, together with T Servis, we built T Stage TESS for the first time. One of the most modern touring systems today, with dimensions of 43x20m and a load capacity of 80 tons. The test build in Radotín took our rigging and steel crew about a week, and together, we trained for the current 4-day construction timeline. We then built it at Rock for People and Masters of Rock at the same pace.

MASTERS OF ROCK

2015-2025

 We have been part of the traditional Vizovice festival, Masters of Rock, for many years. Every year, we send a large crew to Moravia, represented by stagehands, riggers, stage managers, and especially the steel crew. In 2024, the festival introduced the T STAGE TESS, whose construction was handled by our scaffolders and steelhands.

kompletní produkční služby

other services

 eventový personál
stagehand
stagehand
stage management
stage management
shameless
360° solutions for cultural events, sports events, conferences, congresses
shameless
concert and festival organization
shameless
Technická produkce
show crew
show crew
bottom of page